1. Make sure the control box connector is secure.
2. Connect the lead "10" control unit with "weight".
3. Check the voltage at the terminals of the control unit.
4. Disconnect the control unit connector and check the continuity of the circuit by connecting an ohmmeter to the terminals of the wiring harness block.