Attention! When checking, use an analog voltmeter. Connect the negative lead of the voltmeter to terminal 2 (Figure 7.32). This check is performed very quickly (within 10 seconds) so that the coil and power transistor do not burn out.
Figure 7.32. Checking the 4G1 engine power transistor
If a fault is detected, the power transistor must be replaced.
